{"id":87304,"date":"2019-12-16T08:00:36","date_gmt":"2019-12-16T13:00:36","guid":{"rendered":"https:\/\/sites.owu.edu\/dailymonster\/?p=87304"},"modified":"2019-12-14T10:19:34","modified_gmt":"2019-12-14T15:19:34","slug":"starting-monday-fire-alarm-kitchen-hood-fire-suppression-sprinkler-elevator-inspections","status":"publish","type":"post","link":"https:\/\/sites.owu.edu\/dailymonster\/starting-monday-fire-alarm-kitchen-hood-fire-suppression-sprinkler-elevator-inspections\/","title":{"rendered":"Starting Today: Fire Alarm, Kitchen Hood Fire Suppression, Sprinkler, Elevator Inspections"},"content":{"rendered":"<p>State-required systems testing will take place in December 2019 and January 2020. Testing times will be from 7 a.m. till 4 p.m. daily. See below for buildings randomly affected. <strong>The alarm visuals and strobe horns\/bells will be activated as noted.<\/strong><\/p>\n<p>Please share this information as needed. All dates listed below are approximate.<\/p>\n<p><strong><u>Fire Alarm Tests and Inspections with Activation:<\/u><\/strong><\/p>\n<ul>\n<li><strong>Dec. 16<\/strong>, Monday-Bashford Hall.<\/li>\n<li><strong>Dec. 17<\/strong>, Tuesday-Hayes Hall.<\/li>\n<li><strong>Dec. 18<\/strong>, Wednesday-Smith Hall East.<\/li>\n<li><strong>Dec. 19<\/strong>, Thursday-Smith Hall.<\/li>\n<li><strong>Dec. 20<\/strong>, Friday-Stuyvesant Hall.<\/li>\n<li><strong>Dec. 26<\/strong>, Thursday-Stuyvesant Hall.<\/li>\n<li><strong>Dec. 27<\/strong>, Friday-Spare day to finish.<\/li>\n<li><strong>Jan. 2<\/strong>, Thursday-Hamilton-Williams Campus Center, 7 a.m. start with approx. 8-hour duration.<\/li>\n<\/ul>\n<p><strong><u>Sprinkler Inspections with and without Fire Alarm Activation as noted:<\/u><\/strong><strong>\u00a0<\/strong><\/p>\n<ul>\n<li><strong>Dec. 16<\/strong>, Monday-with fire alarm activation.<br \/>\no\u00a0\u00a0 Schimmel\/Conrades Science Center.<br \/>\no\u00a0\u00a0 Elliott Hall.<br \/>\no\u00a0\u00a0 Corns Building.<br \/>\no\u00a0\u00a0 Hamilton-Williams Campus Center.<br \/>\no\u00a0\u00a0 Chappelear Drama Center.<br \/>\no\u00a0\u00a0 Meek Aquatics and Recreation Center.<br \/>\no\u00a0\u00a0 Edgar Hall and 3D Arts Building.<br \/>\no\u00a0\u00a0 Edwards Gymnasium and Simpson Querrey Fitness Center.<br \/>\no\u00a0\u00a0 Merrick Hall.<br \/>\no\u00a0\u00a0 4, 23 &amp; 35 Williams Drive.<br \/>\no\u00a0\u00a0 Stuyvesant Hall.<br \/>\no\u00a0\u00a0 94-110-118 Rowland Ave. and 81 Oak Hill.<\/li>\n<\/ul>\n<ul>\n<li><strong>Dec. 17<\/strong>, Tuesday-finish Monday run-over inspections proceed to systems without fire alarm activation.<br \/>\no\u00a0\u00a0 Mowry Alumni Center.<br \/>\no\u00a0\u00a0 Smith Hall East and West.<br \/>\no\u00a0\u00a0 Selby Stadium East and West.<br \/>\no\u00a0\u00a0 Ross Art Museum.<br \/>\no\u00a0\u00a0 Welch Hall.<\/li>\n<\/ul>\n<ul>\n<li><strong>Dec. 18<\/strong>, Wednesday-half day, complete inspections as needed.<\/li>\n<\/ul>\n<p><strong><u>Kitchen Hood Fire Suppression System Test and Inspection with Fire Alarm Activation:<\/u><\/strong><\/p>\n<ul>\n<li><strong>Jan. 6<\/strong>, Monday-Hamilton-Williams Campus Center, Smith Hall, Stuyvesant Hall, Welch Hall, 3D Arts Building.<\/li>\n<li><strong>Jan. 7<\/strong>, Tuesday-Complete Wednesday inspections, all fraternities and 35 Williams Drive.<\/li>\n<li><strong>Jan. 8<\/strong>, Wednesday-Complete inspections as needed.<\/li>\n<li><strong>Jan. 6-8<\/strong>, The HWCC kitchen hood will be under repair. There may be fire-alarm activation to test the new controls.<\/li>\n<\/ul>\n<p><strong><u>Elevator Inspection:<\/u><\/strong><\/p>\n<p>This will happen Jan. 21-24 and will take approx. one hour each to perform. This will not be too disruptive and the schedule is random.<\/p>\n<p>Thank you for your time and your patience as we complete this required testing.<\/p>\n<p>Gregg Blume, ext. # 3410<\/p>\n<p>Building and Grounds<br \/>\n740-368-3400 Office (ext. # 3400)<br \/>\n740-368-3498 Fax<br \/>\n740-368-3410 Electrical Shop<br \/>\n<a href=\"mailto:ghblume@owu.edu\">ghblume@owu.edu<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>State-required systems testing will take place in December 2019 and January 2020. Testing times will be from 7 a.m. till 4 p.m. daily. See below for buildings randomly affected. The alarm visuals and strobe horns\/bells will be activated as noted. Please share this information as needed. All dates listed below are approximate. Fire Alarm Tests [&hellip;]<\/p>\n","protected":false},"author":2057,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[2],"tags":[],"class_list":["post-87304","post","type-post","status-publish","format-standard","hentry","category-campuswide-news-events"],"blocksy_meta":{"styles_descriptor":{"styles":{"desktop":"","tablet":"","mobile":""},"google_fonts":[],"version":6}},"acf":[],"_links":{"self":[{"href":"https:\/\/sites.owu.edu\/dailymonster\/wp-json\/wp\/v2\/posts\/87304","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sites.owu.edu\/dailymonster\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sites.owu.edu\/dailymonster\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sites.owu.edu\/dailymonster\/wp-json\/wp\/v2\/users\/2057"}],"replies":[{"embeddable":true,"href":"https:\/\/sites.owu.edu\/dailymonster\/wp-json\/wp\/v2\/comments?post=87304"}],"version-history":[{"count":3,"href":"https:\/\/sites.owu.edu\/dailymonster\/wp-json\/wp\/v2\/posts\/87304\/revisions"}],"predecessor-version":[{"id":87307,"href":"https:\/\/sites.owu.edu\/dailymonster\/wp-json\/wp\/v2\/posts\/87304\/revisions\/87307"}],"wp:attachment":[{"href":"https:\/\/sites.owu.edu\/dailymonster\/wp-json\/wp\/v2\/media?parent=87304"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sites.owu.edu\/dailymonster\/wp-json\/wp\/v2\/categories?post=87304"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sites.owu.edu\/dailymonster\/wp-json\/wp\/v2\/tags?post=87304"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}